Infrastructure Associates
  • Home
  • Firm
    • Leadership
    • Careers
  • Portfolio
    • All
    • Aviation
    • Higher Education
    • K-12
    • Municipal
    • Parking Garages
    • Religious
    • Commercial/Hospitality
    • Laboratories / Healthcare
    • Pump Stations / Waste Water Treatment
    • Manufacturing / Industrial
  • Services
    • MEP Engineering
    • Civil Engineering
    • Structural Engineering
    • Transportation
    • Construction Management
    • Commissioning
    • Sustainability
  • Contact

Houston Community College - Stafford


Owner: Houston Community College
Architect: Kirksey Architecture/ RDLR
MEP Engineer: Infrastructure Associates
General Contractor: Tellepsen Builders
Construction Budget: $26.25 Million
PROJECT BACKGROUND
The HCC Stafford New workforce center was designed to house the latest in technology giving students access to equipment they will be handling in a real work environment. The new facility will include live teaching labs for  manufacturing, welding and pipe fitting, 3D printing and HVAC / Electrical installation.
​

MECHANICAL DESIGN
The building is supplied by chilled water from 2 air cooled chillers located in the central plant next to the building.  The hydronic hot water was provided by local boilers and pumps. The building is served by a mix of Air handlers for the classroom and office spaces and roof mounted air handling equipment for the lab spaces. The welding lab was provided with a welding exhaust system on VFD’s. The vfd’s  ramps the exhaust up and down based on welding demands as an energy saving measure.

ELECTRICAL DESIGN
The electrical infrastructure for this building was designing to accommodate the need of the owner to provide their shop instructors as much flexibility as possible so that more equipment could be added as needs arise.  This was accomplished by providing multiple voltages and overhead buss duct runs making it easier and quicker to make changes from year to year. The building was provided with energy efficient LED lighting which provided less than 0.8 Watt per square foot, which is approximately 25% than new code allowances.  A 125KW generator was also designed for emergency/optional needs.
​
PLUMBING DESIGN
Compressed air was provided in each lab for processes and equipment. The plumbing fixtures within the building are ultra low flow in order to help obtain a LEED rating for the building.

Infrastructure Associates, Inc.
6117 Richmond Avenue, Suite 200
Houston, Texas 77057
T: 713-622-0120
​
© Infrastructure Associates 2024

  • Home
  • Firm
    • Leadership
    • Careers
  • Portfolio
    • All
    • Aviation
    • Higher Education
    • K-12
    • Municipal
    • Parking Garages
    • Religious
    • Commercial/Hospitality
    • Laboratories / Healthcare
    • Pump Stations / Waste Water Treatment
    • Manufacturing / Industrial
  • Services
    • MEP Engineering
    • Civil Engineering
    • Structural Engineering
    • Transportation
    • Construction Management
    • Commissioning
    • Sustainability
  • Contact