Stafford Municipal School District Middle School
Owner: SMSD
Architect: Autoarch MEP Engineer: Infrastructure Associates Construction Budget: $62M |
PROJECT DESCRIPTION
Designed to be LEED Certified, Stafford Middle School received a complete MEP and IT system design. The mechanical design included a new air cooled chiller to serve the new building. Energy Recovery Units were strategically placed to capture relief air. The buildings energy efficiency was designed to offer electrical savings for the District. Daylight harvesting was used in order to provide a more efficient system. The plumbing system was designed with efficiency, and environmental safety in mind. Low flow fixtures were incorporated in design, and water conservation measures were utilized to provide maximum efficiency. |